Comparison ledger
Thermo Fisher 1300 Series Safety, Tokyo Electron Mark 7, side by side. Every value shown is drawn from the cited encyclopedia entries.
| Attribute | 1300 Series SafetyThermo Fisher | Mark 7Tokyo Electron |
|---|---|---|
| OEM | Thermo Fisher | Tokyo Electron |
| Category | Wet Processing / Clean | Wet Processing / Clean |
| Wafer size | — | — |
| Process node | — | — |
| Introduced | — | — |
| Production run | — | — |
| Lifecycle | — | — |
| Lifecycle milestones | 2026 Third-party support only | — |
| Control system | — | — |
| Generation | — | — |
| Family | Thermo Fisher 1300 | Tokyo Electron Mark |
| Cited variants | — |
|
| Specifications | ||
| Configuration | Class II[2] | 1C2D[5] |
| Cabinet type | Class II, Type A2 biological safety cabinet[3] | — |
| Airflow compensation | SmartFlow airflow compensation system[3] | — |
| Motors | Dual DC motors[3] | — |
| Front window design | SmartClean front window design[3] | — |
| Control panel | Intuitive control panel with constant readout of downflow and inflow velocities and filter reserve status[3] | — |
| UV light | Programmable UV light[3] | — |
| SmartPort | SmartPort convenience for routing tubing and cables through the side walls[3] | — |
| Available widths | 3-foot, 4-foot, 5-foot, and 6-foot sizes[3] | — |
| Front opening choices | 8-inch or 10-inch front opening[3] | — |
| Filter specification | H14 HEPA filters, EN 1822, 99.995% @ MPPS[4] | — |
| Certification | NSF/ANSI 49, UL, CE[4] | — |
| Service valves | Up to 6 total, 3 on each side wall[4] | — |
| Wafer size range | — | 5 inch to 8 inch[6] |
| Wafer transport | — | Vacuumless robotic transport[6] |
| Chuck types | — | Mechanical and vacuum chucks for top and back side cleaning[6] |
| Brush control | — | Automatic brush pressure controller[6] |
| Optional cleaning | — | Jet or megasonic cleaning[6] |
| Host communication | — | GEM host communication[6] |
| Interface | — | SMIF interface[6] |
| Compliance | — | S2-93 and CE mark[6] |
| Vintage | — | 2011 |
| Coaters & Developers Vintage | — | 2011 |
Plan your fab
Building a Wet Processing / Clean process? Get a complete equipment list.
Open the fab equipment planner →